files.josephlombardo.com - /client/BIDDING NOW/2022 BIDDING PROJECTS/Rockland County Solid Waste Management #2022-12 - Booster Pump Facility Upgrades/


[To Parent Directory]

10/26/2022 1:43 PM 7413248 A-1 Furnish and Install New 12-inch Diameter 4-Way Cross fitting and Air Relief Valve.xls
10/26/2022 1:42 PM 7416320 A-2 Furnish and Install New 8-inch Diameter 300# 22 ½ degree Elbow Fitting.xls
10/26/2022 1:52 PM 7413248 A-3 Furnish and Install New 4-inch Diameter Pipe and Gate Valve at the Existing Expansion Tank.xls
10/26/2022 3:26 PM 7411712 A-4 Furnish and Install New Air Relief Valve in Existing Precast Manhole Structure..xls
10/26/2022 3:25 PM 7412224 A-5 Furnish One and Install Two 8-inch Diameter Gate Valves, and Furnish and Install One 12-inch Diameter Gate Val.xls
10/26/2022 3:24 PM 7411200 A-6 Complete Modifications to the ½-inch Copper Tubing Serving the Existing Pressure Switches, Complete.xls
10/27/2022 1:14 PM 11653 ADDENDUM COVER SHEET.docx
10/27/2022 1:17 PM <dir> ADDENDUM#1
10/27/2022 1:17 PM <dir> BID FORM
10/27/2022 1:15 PM <dir> DRAWINGS
10/25/2022 12:37 PM 11705 LABEL FOR ENEVELOP.docx
10/27/2022 1:15 PM <dir> RFI'S
10/27/2022 1:15 PM <dir> SPECS
10/27/2022 1:16 PM <dir> VENDORS